SURVIVABILITY REPORT

« Back to front page

Compartment RCIC

Properties

Description:CIC
Purpose:CON
Volume:320.8 m³
Vessel: S-CORVETTE_EQP

Location of the compartment in the vessel and the EBPs surrounding the compartment:

EBPs

The following EBPs are located in this compartment:

NameAdjacent compartmentOrientationAreaPlate thicknessPlate materialPlate massStiffener materialMass from stiffenersTotal EBP massCoG XCoG YCoG ZBallistic protection IDBallistic protection thickness
EBP.R3DK4.3 R3DK4 X16.20 m²5.0 mmA635.85 kgA261.12 kg896.97 kg68.40 m0.00 m9.95 mMST5.0 mm
EBP.RACC2-1.7 RACC2-1 Z18.00 m²5.0 mmA706.50 kgA683.26 kg1,389.76 kg63.90 m2.00 m8.60 mMST5.0 mm
EBP.RACC2-2.7 RACC2-2 Z18.00 m²5.0 mmA706.50 kgA683.26 kg1,389.76 kg63.90 m-2.00 m8.60 mMST5.0 mm
EBP.RCIC.15 REQ2 Z2.70 m²5.0 mmA105.98 kgA100.35 kg206.33 kg51.30 m2.75 m11.30 mMST5.0 mm
EBP.RCIC.16 REQ1 Z2.70 m²5.0 mmA105.98 kgA100.35 kg206.33 kg51.30 m-2.75 m11.30 mMST5.0 mm
EBP.RCIC.1 RHANGAR X16.20 m²5.0 mmA635.85 kgA261.12 kg896.97 kg48.60 m0.00 m9.95 mMST5.0 mm
EBP.RCIC.14 RRADAR Z27.00 m²5.0 mmA1,059.75 kgA1,118.84 kg2,178.60 kg51.30 m0.00 m11.30 mMST5.0 mm
EBP.RCIC.9 RCOR7 Z18.00 m²5.0 mmA706.50 kgA683.26 kg1,389.76 kg63.90 m0.00 m8.60 mMST5.0 mm
EBP.RCIC.3 REQ6 Y24.30 m²5.0 mmA953.77 kgA290.80 kg1,244.57 kg63.90 m-3.00 m9.95 mMST5.0 mm
EBP.RCIC.5 REQ5 Y24.30 m²5.0 mmA953.77 kgA290.80 kg1,244.57 kg63.90 m3.00 m9.95 mMST5.0 mm
EBP.RCIC.7 RMSW2 Z21.60 m²5.0 mmA847.80 kgA824.19 kg1,671.99 kg54.00 m2.00 m8.60 mMST5.0 mm
EBP.RCIC.10 RCOR6 Z21.60 m²5.0 mmA847.80 kgA824.19 kg1,671.99 kg54.00 m0.00 m8.60 mMST5.0 mm
EBP.RCIC.8 RECR2 Z21.60 m²5.0 mmA847.80 kgA824.19 kg1,671.99 kg54.00 m-2.00 m8.60 mMST5.0 mm
EBP.RCIC.4 REQ4 Y29.16 m²5.0 mmA1,144.53 kgA353.11 kg1,497.64 kg54.00 m-3.00 m9.95 mMST5.0 mm
EBP.RCIC.6 REQ3 Y29.16 m²5.0 mmA1,144.53 kgA353.11 kg1,497.64 kg54.00 m3.00 m9.95 mMST5.0 mm
EBP.RCIC.13 RSUP1 Z86.40 m²5.0 mmA3,391.20 kgA3,625.57 kg7,016.77 kg61.20 m0.00 m11.30 mMST5.0 mm

More information about Materials and Structures.

Equipment

The following equipment is located in this compartment:

IDEquipment tableDescription
CIC ControlCombat Information Center

Detonation

Detonation does not take place in this compartment in any of the cases.

Damage

The probability that this compartment gets damaged is 16.81 %.

It's damaged in the following cases:

#NameProbabilityCauseWarhead
4 EXOCET-R3DK4 2.26 %Pressure, fragmentation EXOCET
7 EXOCET-RACC21 0.71 %Pressure, fragmentation EXOCET
8 EXOCET-RACC22 0.71 %Pressure, fragmentation EXOCET
27 EXOCET-RECR2 0.55 %Pressure, fragmentation EXOCET
28 EXOCET-REQ1 0.45 %Pressure, fragmentation EXOCET
29 EXOCET-REQ2 0.45 %Pressure, fragmentation EXOCET
30 EXOCET-REQ3 0.49 %Pressure, fragmentation EXOCET
31 EXOCET-REQ4 0.49 %Pressure, fragmentation EXOCET
32 EXOCET-REQ5 0.62 %Pressure, fragmentation EXOCET
33 EXOCET-REQ6 0.62 %Pressure, fragmentation EXOCET
43 EXOCET-RHANGAR 5.14 %Pressure, fragmentation EXOCET
48 EXOCET-RMSW2 0.55 %Pressure, fragmentation EXOCET
61 EXOCET-RSUP1 3.79 %Pressure, fragmentation EXOCET