SURVIVABILITY REPORT

« Back to front page

Compartment RSTK2

Properties

Description:service tank aft
Purpose:HFO
Volume:8.6 m³
Vessel: S-CORVETTE_EQP

Location of the compartment in the vessel and the EBPs surrounding the compartment:

EBPs

The following EBPs are located in this compartment:

NameAdjacent compartmentOrientationAreaPlate thicknessPlate materialPlate massStiffener materialMass from stiffenersTotal EBP massCoG XCoG YCoG ZBallistic protection IDBallistic protection thickness
EBP.RAUX1.1 RAUX1 X52.12 m²8.0 mmA3,272.97 kgA1,674.25 kg4,947.22 kg34.20 m0.00 m3.61 mMST8.0 mm
EBP.RCOR3.7 RCOR3 Z2.40 m²6.0 mmA113.04 kgA170.97 kg284.01 kg33.60 m0.00 m5.60 mMST6.0 mm
EBP.RERAFT.38 RERAFT Y2.88 m²6.0 mmA135.65 kgA26.38 kg162.02 kg33.60 m-1.50 m4.40 mMST6.0 mm
EBP.RERAFT.39 RERAFT Y2.88 m²6.0 mmA135.65 kgA26.38 kg162.02 kg33.60 m1.50 m4.40 mMST6.0 mm
EBP.RERAFT.40 RERAFT Z3.60 m²6.0 mmA169.56 kgA280.95 kg450.51 kg33.60 m0.00 m3.20 mMST6.0 mm
EBP.RERAFT.37 RERAFT X7.20 m²8.0 mmA452.16 kgA226.83 kg678.99 kg33.00 m0.00 m4.40 mMST8.0 mm
EBP.ROFF1.5 ROFF1 Z0.60 m²6.0 mmA28.26 kgA42.74 kg71.00 kg33.60 m-1.25 m5.60 mMST6.0 mm
EBP.ROMESS.5 ROMESS Z0.60 m²6.0 mmA28.26 kgA42.74 kg71.00 kg33.60 m1.25 m5.60 mMST6.0 mm

More information about Materials and Structures.

Equipment

This compartment does not contain any equipment.

Detonation

The probability that detonation takes place in this compartment is 1.01 %.

Detonation takes place in this compartment in the following cases:

#NameProbabilityWarhead
99 155MMSHELL-RSTK2 1.01 % 155MMSHELL

Damage

The probability that this compartment gets damaged is 2.02 %.

It's damaged in the following cases:

#NameProbabilityCauseWarhead
12 155MMSHELL-RAUX1 1.01 %Fragmentation 155MMSHELL
99 155MMSHELL-RSTK2 1.01 %Pressure, fragmentation 155MMSHELL

© 2017 Surma Ltd