SURVIVABILITY REPORT

« Back to front page

Compartment RSTK1

Properties

Description:service tank fore
Purpose:HFO
Volume:8.6 m³
Vessel: S-CORVETTE_EQP

Location of the compartment in the vessel and the EBPs surrounding the compartment:

EBPs

The following EBPs are located in this compartment:

NameAdjacent compartmentOrientationAreaPlate thicknessPlate materialPlate massStiffener materialMass from stiffenersTotal EBP massCoG XCoG YCoG ZBallistic protection IDBallistic protection thickness
EBP.RCOR6.5 RCOR6 Z2.40 m²6.0 mmA113.04 kgA170.97 kg284.01 kg49.20 m0.00 m5.60 mMST6.0 mm
EBP.RECR2.5 RECR2 Z0.60 m²6.0 mmA28.26 kgA42.74 kg71.00 kg49.20 m-1.25 m5.60 mMST6.0 mm
EBP.RERFORE.37 RERFORE Y2.88 m²6.0 mmA135.65 kgA26.38 kg162.02 kg49.20 m-1.50 m4.40 mMST6.0 mm
EBP.RERFORE.38 RERFORE Y2.88 m²6.0 mmA135.65 kgA26.38 kg162.02 kg49.20 m1.50 m4.40 mMST6.0 mm
EBP.RERFORE.39 RERFORE Z3.60 m²6.0 mmA169.56 kgA280.95 kg450.51 kg49.20 m0.00 m3.20 mMST6.0 mm
EBP.RERFORE.36 RERFORE X7.20 m²8.0 mmA452.16 kgA226.83 kg678.99 kg49.80 m0.00 m4.40 mMST8.0 mm
EBP.RMSW2.5 RMSW2 Z0.60 m²6.0 mmA28.26 kgA42.74 kg71.00 kg49.20 m1.25 m5.60 mMST6.0 mm
EBP.RSTO4.P.2 RSTO4.P X3.60 m²8.0 mmA226.08 kgA97.21 kg323.29 kg48.60 m0.75 m4.40 mMST8.0 mm
EBP.RSTO4.S.2 RSTO4.S X3.60 m²8.0 mmA226.08 kgA97.21 kg323.29 kg48.60 m-0.75 m4.40 mMST8.0 mm

More information about Materials and Structures.

Equipment

The following equipment is located in this compartment:

IDEquipment tableDescription
Service 2 Diesel oilService tank 2, generators

Detonation

The probability that detonation takes place in this compartment is 1.01 %.

Detonation takes place in this compartment in the following cases:

#NameProbabilityWarhead
98 155MMSHELL-RSTK1 1.01 % 155MMSHELL

Damage

The probability that this compartment gets damaged is 2.02 %.

It's damaged in the following cases:

#NameProbabilityCauseWarhead
2 155MMSHEL-RERFORE 1.01 %Fragmentation 155MMSHELL
98 155MMSHELL-RSTK1 1.01 %Pressure, fragmentation 155MMSHELL

© 2017 Surma Ltd