SURVIVABILITY REPORT

« Back to front page

Compartment REQ5

Properties

Description:Equipment space 5, DK4
Purpose:MAP
Volume:90.7 m³
Vessel: S-CORVETTE_EQP

Location of the compartment in the vessel and the EBPs surrounding the compartment:

EBPs

The following EBPs are located in this compartment:

NameAdjacent compartmentOrientationAreaPlate thicknessPlate materialPlate massStiffener materialMass from stiffenersTotal EBP massCoG XCoG YCoG ZBallistic protection IDBallistic protection thickness
EBP.R3DK4.2 R3DK4 X9.21 m²5.0 mmA361.59 kgA149.21 kg510.81 kg68.40 m4.71 m9.92 mMST5.0 mm
EBP.RACC2-1.6 RACC2-1 Z35.06 m²5.0 mmA1,376.28 kgA1,452.78 kg2,829.06 kg63.76 m4.95 m8.60 mMST5.0 mm
EBP.RCIC.5 RCIC Y24.30 m²5.0 mmA953.77 kgA290.80 kg1,244.57 kg63.90 m3.00 m9.95 mMST5.0 mm
EBP.REQ3.3 REQ3 X10.80 m²5.0 mmA423.88 kgA167.86 kg591.74 kg59.40 m5.00 m9.92 mMST5.0 mm
EBP.REQ5.6 RSUP1 Z31.08 m²5.0 mmA1,219.85 kgA1,287.88 kg2,507.73 kg63.78 m4.73 m11.30 mMST5.0 mm
EBP.REQ5.4 OUTSIDE Y24.99 m²5.0 mmA980.80 kgA621.41 kg1,602.21 kg63.91 m6.73 m9.94 mMST5.0 mm

More information about Materials and Structures.

Equipment

This compartment does not contain any equipment.

Detonation

The probability that detonation takes place in this compartment is 1.01 %.

Detonation takes place in this compartment in the following cases:

#NameProbabilityWarhead
47 155MMSHELL-REQ5 1.01 % 155MMSHELL

Damage

The probability that this compartment gets damaged is 5.05 %.

It's damaged in the following cases:

#NameProbabilityCauseWarhead
13 155MMSHELL-R3DK4 1.01 %Fragmentation 155MMSHELL
44 155MMSHELL-RACC21 1.01 %Pressure, fragmentation 155MMSHELL
47 155MMSHELL-REQ5 1.01 %Pressure, fragmentation 155MMSHELL
54 155MMSHELL-REQ3 1.01 %Pressure, fragmentation 155MMSHELL
78 155MMSHELL-RCIC 1.01 %Pressure, fragmentation 155MMSHELL

© 2017 Surma Ltd