SURVIVABILITY REPORT

« Back to front page

Case 155MMSHELL-RPUMP1

Description

No stability issues. Probability assigned to this case: 1.01 %

Warhead

Warhead: 155MMSHELL
Explosive:TNT
Explosive mass:7.0 kg
Casing mass:36.4 kg

Detonation location

Compartment: RPUMP1
Coordinates:X = 45.01 m, Y = 0.00 m, Z = 2.16 m

Operational readiness

Operational Readiness Level after hit: ORL1
Floating position indicative level:F1
Floating position description:No stability issues
Heel:0.00 °
System level:S1
Critical systems remaining:96.8 %
Non-critical systems remaining:
Systems remaining (critical or not):96.8 %
Equipment remaining:100.0 %
Compartment damage level:C1
The share of compartment volume not damaged:90.8 %
Compartments remaining:93.9 %

Structural Damage

Fragment Damage

Pressure Damage


Pressure damaged compartments:1
Fragmentation damaged compartments:6
Flooded compartments:0
Total damaged compartments:6

List of damaged compartments

IDDescriptionDamage type
RPUMP1 pump roomPressure, fragmentation
RKERO Kerosine tankFragmentation
RERFORE engine room foreFragmentation
RFO2P fuel tank2, MIDFragmentation
RSTO4.P Storage space reservationFragmentation
RSTO4.S Storage space reservationFragmentation

Equipment Damage

No damage to equipment.

Damage to Routes

IDLost, cause
Gen2-swbkilled:frag/

Damage to Systems

NameIDParent systemRedundancy groupsCritical?Lost, causeRepairable, cause
Gen2 Prop Gen2 Prop EL propulsion EL propulsion Gensets RG Yesfragments

Floating Position

No stability issues. Damage stability analysis was skipped as there was no pressure damaged EBPs.

Initial
Draught:4.00 m
Trim:0.00 m
Heel:0.00 °
GM:4.72 m

Floating position after hit:

GZ Curve

GZ curve after hit:

Longitudinal Strength Curves

Longitudinal strength curves after hit:

No longitudinal strength curve available for this case.

© 2017 Surma Ltd