SURVIVABILITY REPORT

« Back to front page

Case 155MMSHELL-RFP

Description

No stability issues. Probability assigned to this case: 1.01 %

Warhead

Warhead: 155MMSHELL
Explosive:TNT
Explosive mass:7.0 kg
Casing mass:36.4 kg

Detonation location

Compartment: RFP
Coordinates:X = 88.03 m, Y = 0.00 m, Z = 4.15 m

Operational readiness

Operational Readiness Level after hit: ORL1
Floating position indicative level:F1
Floating position description:No stability issues
Heel:0.00 °
System level:S1
Critical systems remaining:100.0 %
Non-critical systems remaining:
Systems remaining (critical or not):100.0 %
Equipment remaining:96.4 %
Compartment damage level:C1
The share of compartment volume not damaged:98.3 %
Compartments remaining:94.9 %

Structural Damage

Fragment Damage

Pressure Damage


Pressure damaged compartments:3
Fragmentation damaged compartments:4
Flooded compartments:0
Total damaged compartments:5

List of damaged compartments

IDDescriptionDamage type
RFP fore peakPressure, fragmentation
RFO4 fuel tank4Pressure
RSTO1 storePressure, fragmentation
RCHLKR Fragmentation
RMOORFORE Mooring station, foreFragmentation

Equipment Damage

List of lost equipment

IDEquipment tableDescriptionCause
DO tank 5 Diesel oilpressure

Damage to Systems

No damage to systems.

Floating Position

No stability issues.

InitialAfter hit
Draught:4.00 m4.00 m
Trim:0.00 m0.00 m
Heel:0.00 °0.00 °
GM:4.72 m4.73 m

Floating position after hit:

GZ Curve

GZ curve after hit:

Longitudinal Strength Curves

Longitudinal strength curves after hit:

No longitudinal strength curve available for this case.

© 2017 Surma Ltd