SURVIVABILITY REPORT

« Back to front page

Case 155MMSHELL-RACC3S

Description

No stability issues. Probability assigned to this case: 1.01 %

Warhead

Warhead: 155MMSHELL
Explosive:TNT
Explosive mass:7.0 kg
Casing mass:36.4 kg

Detonation location

Compartment: RACC3-S
Coordinates:X = 72.61 m, Y = -3.07 m, Z = 7.19 m

Operational readiness

Operational Readiness Level after hit: ORL1
Floating position indicative level:F1
Floating position description:No stability issues
Heel:0.00 °
System level:S1
Critical systems remaining:100.0 %
Non-critical systems remaining:
Systems remaining (critical or not):100.0 %
Equipment remaining:100.0 %
Compartment damage level:C1
The share of compartment volume not damaged:92.8 %
Compartments remaining:91.9 %

Structural Damage

Fragment Damage

Pressure Damage


Pressure damaged compartments:4
Fragmentation damaged compartments:7
Flooded compartments:0
Total damaged compartments:8

List of damaged compartments

IDDescriptionDamage type
RACC3-S Pressure, fragmentation
R3DK4 Pressure, fragmentation
RSTA2 Staircase decks 2-1Pressure
RCOR8 Pressure, fragmentation
RACC2-2 petty officiers, SFragmentation
RVLS VLSFragmentation
RACC1 ratings accomodationFragmentation
RVOIDF-S Fragmentation

Equipment Damage

No damage to equipment.

Damage to Systems

No damage to systems.

Floating Position

No stability issues.

InitialAfter hit
Draught:4.00 m4.00 m
Trim:0.00 m0.00 m
Heel:0.00 °0.00 °
GM:4.72 m4.73 m

Floating position after hit:

GZ Curve

GZ curve after hit:

Longitudinal Strength Curves

Longitudinal strength curves after hit:

No longitudinal strength curve available for this case.

© 2017 Surma Ltd