SURVIVABILITY REPORT

« Back to front page

Equipment TRA2

Properties

Equipment table:EQP*PROPULSION
Type: MACHINERY
Description:TRANSMISSION
Compartment: R.DB03C
Center of gravity:X = 6.00 m, Y = -1.50 m, Z = 2.00 m
X length:1.00 m
Y length:1.00 m
Z length:1.00 m
Volume:1.0 m³
Mass:10.000 t
Parent systems: PROPULSION
Redundancy groups:

Location in the vessel:

Shock Response Spectrum

Shock response

Acceleration time history for shock response

Velocity time history for shock response

Displacement time history for shock response

Relative displacements were zero between the equipment and the EBP beneath it (equipment is mounted rigidly to the EBP).

Whipping response

Acceleration time history whipping response

Velocity time history for whipping response

Displacement time history for whipping response

Relative displacements were zero between the equipment and the EBP beneath it (equipment is mounted rigidly to the EBP).

Damage

The probability that this piece of equipment gets damaged is 100.00 %.

It's damaged in the following cases:

#NameProbabilityCauseSeverityWarheadDetonation compartment
1 UNDEX_MINE-1 100.00 %accelerationlost MINE OUTSIDE

© 2016 Surma Ltd