SURVIVABILITY REPORT

« Back to front page

Compartment R.TD01C

Properties

Description:Aft Store
Purpose:Deck Store
Volume:28.2 m³
Vessel: PATROLBOAT

Location of the compartment in the vessel and the EBPs surrounding the compartment:

EBPs

The following EBPs are located in this compartment:

NameAdjacent compartmentOrientationAreaPlate thicknessPlate materialPlate massStiffener materialMass from stiffenersTotal EBP massCoG XCoG YCoG ZBallistic protection IDBallistic protection thickness
SURMA.EBP.R.DB01C.5 R.DB01C Z11.56 m²5.0 mmA453.69 kgA292.47 kg746.16 kg0.86 m0.00 m2.40 mMST4.0 mm
SURMA.EBP.R.TD01C.2 R.TD02C X13.63 m²7.0 mmA748.92 kgA358.00 kg1,106.92 kg1.80 m0.00 m3.44 mMST4.0 mm
SURMA.EBP.R.TD01C.4 OUTSIDE Z7.69 m²5.0 mmA301.86 kgA279.22 kg581.08 kg0.65 m-1.65 m4.46 mMST4.0 mm
SURMA.EBP.R.TD01C.5 OUTSIDE Z7.69 m²5.0 mmA301.84 kgA279.19 kg581.03 kg0.65 m1.65 m4.46 mMST4.0 mm
SURMA.EBP.R.TD01C.7 OUTSIDE Y4.28 m²6.3 mmA211.58 kgA165.06 kg376.64 kg0.74 m-3.24 m3.41 mMST4.0 mm
SURMA.EBP.R.TD01C.6 OUTSIDE Y4.28 m²6.3 mmA211.57 kgA159.32 kg370.89 kg0.74 m3.24 m3.41 mMST4.0 mm
SURMA.EBP.R.TD01C.1 OUTSIDE X13.37 m²6.3 mmA661.29 kgA490.88 kg1,152.17 kg-0.31 m0.00 m3.44 mMST4.0 mm

More information about Materials and Structures.

Equipment

The following equipment is located in this compartment:

IDEquipment tableDescription
RUM1 EQP*STEERINGRUDDER MACHINE
RUM2 EQP*STEERINGRUDDER MACHINE
RUST1 EQP*STEERINGRUDDER STOCK
RUST2 EQP*STEERINGRUDDER STOCK

Detonation

Detonation does not take place in this compartment in any of the cases.

Damage

This compartment is not damaged in any of the cases.

© 2016 Surma Ltd