SURVIVABILITY REPORT

« Back to front page

Compartment R.TD01C

Properties

Description:Aft Store
Purpose:DST
Volume:28.2 m³
Vessel: PATROLBOAT

Location of the compartment in the vessel and the EBPs surrounding the compartment:

EBPs

The following EBPs are located in this compartment:

NameAdjacent compartmentOrientationAreaPlate thicknessPlate materialPlate massStiffener materialMass from stiffenersTotal EBP massCoG XCoG YCoG ZBallistic protection IDBallistic protection thickness
EBP.R.TD01C.3 R.DB01C Z11.56 m²5.0 mmA453.69 kgA295.47 kg749.16 kg0.86 m0.00 m2.40 mMST5.0 mm
EBP.R.TD01C.2 R.TD02C X13.63 m²7.0 mmA748.92 kgA370.23 kg1,119.16 kg1.80 m0.00 m3.44 mMST7.0 mm
EBP.R.TD01C.4 OUTSIDE Z7.69 m²5.0 mmA301.86 kgA279.22 kg581.08 kg0.65 m-1.65 m4.46 mMST5.0 mm
EBP.R.TD01C.5 OUTSIDE Z7.69 m²5.0 mmA301.84 kgA279.19 kg581.03 kg0.65 m1.65 m4.46 mMST5.0 mm
EBP.R.TD01C.7 OUTSIDE Y4.28 m²6.3 mmA211.58 kgA165.06 kg376.64 kg0.74 m-3.24 m3.41 mMST6.3 mm
EBP.R.TD01C.6 OUTSIDE Y4.28 m²6.3 mmA211.57 kgA159.32 kg370.89 kg0.74 m3.24 m3.41 mMST6.3 mm
EBP.R.TD01C.1 OUTSIDE X13.37 m²6.3 mmA661.29 kgA505.29 kg1,166.59 kg-0.31 m0.00 m3.44 mMST6.3 mm

More information about Materials and Structures.

Equipment

The following equipment is located in this compartment:

IDEquipment tableDescription
RUM1 EQP*STEERINGRudder machine
RUST1 EQP*STEERINGRudder stock
RUM2 EQP*STEERINGRudder machine
RUST2 EQP*STEERINGRudder stock

Detonation

The probability that detonation takes place in this compartment is 4.21 %.

Detonation takes place in this compartment in the following cases:

#NameProbabilityWarhead
8 EXOCET-RTD01C 4.21 % EXOCET

Damage

The probability that this compartment gets damaged is 9.36 %.

It's damaged in the following cases:

#NameProbabilityCauseWarhead
1 EXOCET-RDB02C 1.38 %Pressure EXOCET
8 EXOCET-RTD01C 4.21 %Pressure, fragmentation EXOCET
9 EXOCET-RTD02C 2.21 %Pressure, fragmentation EXOCET
50 EXOCET-RDB01C 1.58 %Pressure, fragmentation EXOCET

© 2017 Surma Ltd