SURVIVABILITY REPORT

« Back to front page

Compartment R.DB07S

Properties

Description:Diesel Oil
Purpose:DO
Volume:4.2 m³
Vessel: PATROLBOAT

Location of the compartment in the vessel and the EBPs surrounding the compartment:

EBPs

The following EBPs are located in this compartment:

NameAdjacent compartmentOrientationAreaPlate thicknessPlate materialPlate massStiffener materialMass from stiffenersTotal EBP massCoG XCoG YCoG ZBallistic protection IDBallistic protection thickness
EBP.R.DB06C.7 R.DB06C X1.69 m²7.0 mmA92.65 kgA34.76 kg127.41 kg13.80 m-1.92 m1.42 mMST7.0 mm
EBP.R.DB07S.2 R.DB08C X1.83 m²5.0 mmA71.69 kgA13.22 kg84.91 kg16.20 m-1.91 m1.37 mMST5.0 mm
EBP.R.DB07S.4 R.DB08C Y2.73 m²5.0 mmA107.08 kgA128.93 kg236.00 kg15.01 m-2.60 m1.51 mMST5.0 mm
EBP.R.DB07S.5 R.TD03S Z3.12 m²5.0 mmA122.46 kgA87.35 kg209.81 kg15.00 m-1.95 m2.07 mMST5.0 mm
EBP.R.DB07S.3 R.DB08C Y3.74 m²5.0 mmA146.84 kgA160.83 kg307.68 kg15.02 m-1.30 m1.29 mMST5.0 mm
EBP.R.DB07S.6 OUTSIDE Z3.29 m²6.3 mmA162.51 kgA194.98 kg357.49 kg15.00 m-1.95 m0.72 mMST6.3 mm

More information about Materials and Structures.

Equipment

The following equipment is located in this compartment:

IDEquipment tableDescription
DO4 EQP*DODiesel oil Main tank

Detonation

The probability that detonation takes place in this compartment is 0.33 %.

Detonation takes place in this compartment in the following cases:

#NameProbabilityWarhead
9 127MMSHELL-RDB07S 0.33 % 127MMSHELL

Damage

The probability that this compartment gets damaged is 8.39 %.

It's damaged in the following cases:

#NameProbabilityCauseWarhead
8 127MMSHELL-RDB07P 0.33 %Fragmentation 127MMSHELL
9 127MMSHELL-RDB07S 0.33 %Pressure, fragmentation 127MMSHELL
10 127MMSHELL-RDB08C 5.52 %Fragmentation 127MMSHELL
20 127MMSHELL-RTD03S 0.91 %Pressure, fragmentation 127MMSHELL
39 127MMSHELL-RDM05S 0.82 %Fragmentation 127MMSHELL
41 127MMSHELL-RDM06S 0.49 %Fragmentation 127MMSHELL

© 2017 Surma Ltd