SURVIVABILITY REPORT

« Back to front page

Case 127MMSHELL-RDB07P

Description

No stability issues. Probability assigned to this case: 0.33 %

Warhead

Warhead: 127MMSHELL
Explosive:TNT
Explosive mass:3.6 kg
Casing mass:20.0 kg

Detonation location

Compartment: R.DB07P
Coordinates:X = 15.02 m, Y = 1.92 m, Z = 1.39 m

Operational readiness

Operational Readiness Level after hit: ORL4
Floating position indicative level:F1
Floating position description:No stability issues
Heel:0.00 °
System level:S4
Critical systems remaining:8.3 %
Non-critical systems remaining:
Systems remaining (critical or not):8.3 %
Equipment remaining:98.1 %
Compartment damage level:C3
The share of compartment volume not damaged:77.1 %
Compartments remaining:86.9 %

Structural Damage

Fragment Damage

Pressure Damage


Pressure damaged compartments:2
Fragmentation damaged compartments:8
Flooded compartments:0
Total damaged compartments:8

List of damaged compartments

IDDescriptionDamage type
R.DB07P Diesel OilPressure, fragmentation
R.TD03P CabinPressure, fragmentation
R.DB06C CCMFragmentation
R.DB08C MachineryFragmentation
R.DB07S Diesel OilFragmentation
R.DM05P MessFragmentation
R.DM04P StorageFragmentation
R.DM01C CorridorFragmentation

Equipment Damage

List of lost equipment

IDEquipment tableDescriptionCause
DO3 EQP*DODiesel oil Main tank fragments, pressure

Damage to Routes

IDLost, cause
EL4_backupkilled:frag/
DO20killed:frag/
DO1killed:frag/
DO3killed:frag/
AAG2killed:frag/
CIC EL 2killed:frag/
DO2killed:frag/
Trans1killed:frag/
Trans2 _2killed:frag/
STEERING1killed:frag/
Streering2 backupkilled:frag/

Damage to Systems

NameIDParent systemRedundancy groupsCritical?Lost, causeRepairable, cause
AAG1 AAG1Yesfragments, pressure
AAG1 BRI control AAG1 BRI control AAG1 AAG1 Control RG Yesfragments, pressure
BRI BRI AAG1 BRI control AAG2 BRI control CON MG_BRI control Trans1 Trans2 CON RG Yesfragments, pressure
EL EL BRI CIC COM CRA Yesfragments, pressure
Gen er Gen er EL EL RG Yesfragments, pressure
DO lines_GEN_ER DO lines_GEN_ER Gen er Yesfragments, pressure
DO Main tanks DO Main tanks DO lines_GEN_ER DO lines ENG1_AU DO lines ENG2_AU DO lines ENG2 DO_lines ENG1 Yesfragments, pressure
Gen1 Gen1 EL EL RG Yesfragments, pressure
EN_AU1 EN_AU1 Gen1 Yesfragments, pressure
DO lines ENG1_AU DO lines ENG1_AU EN_AU1 Eng1 Yesfragments, pressure
Gen2 Gen2 EL EL RG Yesfragments, pressure
EN_AU2 EN_AU2 Gen2 Yesfragments, pressure
DO lines ENG2_AU DO lines ENG2_AU EN_AU2 Yesfragments, pressure
AAG1 CIC control AAG1 CIC control AAG1 AAG1 Control RG Yesfragments, pressure
CIC CIC AAG1 CIC control AAG2 CIC control CON MG CIC control CON RG Yesfragments, pressure
AAG2 AAG2Yesfragments, pressure
AAG2 BRI control AAG2 BRI control AAG2 AAG2 Control RG Yesfragments, pressure
AAG2 CIC control AAG2 CIC control AAG2 AAG2 Control RG Yesfragments, pressure
COM COMYesfragments, pressure
CON CON COM STEERING Yesfragments, pressure
CRA CRAYesfragments, pressure
DO lines ENG2 DO lines ENG2 Eng2 Yesfragments, pressure
DO_lines ENG1 DO_lines ENG1Yesfragments, pressure
ENG ENGYesfragments, pressure
Eng1 Eng1 ENG Trans1 ENG RG Yesfragments, pressure
Eng2 Eng2 ENG Trans2 ENG RG Yesfragments, pressure
MG MGYesfragments, pressure
MG CIC control MG CIC control MG MG Control RG Yesfragments, pressure
MG_BRI control MG_BRI control MG MG Control RG Yesfragments, pressure
PROPULSION PROPULSIONYesfragments, pressure
Trans1 Trans1 PROPULSION PROPULSION Trans RG Yesfragments, pressure
Trans2 Trans2 PROPULSION PROPULSION Trans RG Yesfragments, pressure
STEERING STEERINGYesfragments, pressure

Floating Position

No stability issues.

InitialAfter hit
Draught:2.29 m2.29 m
Trim:0.27 m0.29 m
Heel:0.00 °0.00 °
GM:1.00 m1.00 m

Floating position after hit:

GZ Curve

GZ curve after hit:

Longitudinal Strength Curves

Longitudinal strength curves after hit:

© 2017 Surma Ltd